If the base floor has a rough structure, it is necessary to additionally apply a compound to obtain a proper coupling. Then the mixture should mature.
The glue on porous substrates takes about 15 minutes to mature. On rough, dense floors, it wilts for up to 30 minutes.
It should be warned that the maturation time of the adhesive, the time until it adheres well to the tile, and the curing properties may vary. It depends on the temperature of the substrate, its type, air humidity and the environment. Next, you need to make sure that the glue is ripe and cured, it is important not to miss this moment, because it will dry out. This can be determined tactilely: you need to touch the mixture on your finger, either there should be no glue left at all, or a small amount.
Tile installation should begin at the point where the perpendicular lines intersect, from the center of the room. Press the sheet with force into its place.
It is necessary to check that the tile edges exactly match the marked lines. After you make sure that the tile laying is correct, if necessary, you need to hammer it with a mallet.
In order to mount the trimmed sheets, you need to put the one that needs to be cut, aligning exactly on top of the last solid tile. Place the second free sheet against the wall and mark with a dash the place where the sheets will overlap.
Then you need to cut the tile along the marked line. Before laying, it is necessary to make sure that the piece fits in its place normally. You do not need to insert it with force, it is better to cut it off a little.
In order to mount tiles around obstacles, structural elements, pipes, you need to make a cardboard template, and first trim it, and only after making sure that everything is done correctly, re-draw its parameters onto the tile.
Before laying the sheet, you need to check the correct alignment. There should be a tight fit, but no effort is needed.
Laying vinyl tiles
If the glue protrudes from the seams, remove it with a soft cloth soaked in denatured alcohol or soapy water. After that, you need to go through it again with a damp cloth.
Important: glue should not be left on the front surface of the sheets. It will be very difficult to remove it in the future.
It is necessary to regularly lift the tiles that are currently being glued during the work process. Approximately 90 percent of the adhesive composition should remain on their back side. A small residue of the substance means that the composition has dried up and it would be better to remove it and add a new one.
After the laying of the 1st quarter of the room is completed, you need to do the rolling. To do this, use a heavy roller.
The coating must be rolled across and along each of the sections. This should be done approximately 30 minutes after the installation of these sections.
In cases where it is inconvenient to work with a heavy roller in any areas, you can use a manual small roller. It is necessary to inspect the coating after rolling to make sure that there is no displacement on the sheets and there are no protrusions of excess glue on their surface.
Attention should also be paid to whether the edges of the tiles have been replaced. After another 30 minutes, repeat the procedure for the 2nd time. It is forbidden to walk on the laid floor covering for two days. How to check 1xBet promo code If these are not 1xBet free bets, but another type of promotion that the bookmaker has sent, then you should check the combination in a special section. The 1xbet bonus code to get a bonus of up to ₹33,000 for sports or ₹1,40,000 + 150 free spins. Using a promo code when registering on the 1xBet platform is an excellent way to enhance your betting experience with exclusive bonuses. Some rewards give a freebet, which must be played on certain conditions (odds, type of bet, etc.). It can be a promo code for express 1xBet and many others.